Project
4-Classroom Block - Wath Malual
Project Details
Location
South Sudan
Duration
Ongoing
The project consisted of the full construction of a 4-classroom facility, beginning with site clearance and excavation works to prepare the foundation. Reinforced concrete works were carried out for both the substructure and superstructure to ensure strength and durability. Masonry works were completed to form the classroom walls, followed by roofing installation to protect the structure from environmental conditions.
Doors and windows were fabricated and installed to provide security, ventilation, and natural lighting. Finishing works included plastering and painting to enhance both appearance and durability. Plumbing and electrical installations were completed to support essential services, while external works improved site accessibility and overall functionality.
Scope of Work
- Site clearance
- Excavation for foundation trenches
- Concrete works for substructure and superstructure
- Masonry wall construction
- Roofing works
- Installation of doors and windows
- Plastering and painting works
- Plumbing and electrical installations
- External works and site improvements
Name of the Project: 4-Classroom Block - Wath Malual
Project Location: South Sudan
Project Completion Date: Ongoing