
Project
TSF FG Gold Project, Sierra Leone
Project Details
Location
Sierra Leone
Duration
Ongoing
The Baomahun Gold Project Tailings Storage Facility (TSF) represents a major engineering undertaking focused on providing a secure, environmentally compliant solution for tailings containment and water management. The project includes the construction of a fully integrated tailings storage system, comprising the TSF basin, embankments, decant return trench, diversion channels, seepage collection systems, and high-performance HDPE geomembrane liner installations.
Scope of Work
The joint venture agreement between The Universal Venture (TUV) and Universal for General Construction and Trading Co. Ltd includes, but is not limited to, the following scope of works:
Site Preparation and Preliminary Works
Earthworks and Foundation Preparation
Drainage, Seepage Control, and Monitoring Systems
HDPE Liner Installation
Hydraulic and Structural Components
Finalization and Quality Assurance
Name of the Project: TSF FG Gold Project, Sierra Leone
Project Location: Sierra Leone
Project Completion Date: Ongoing
Building Your Vision





















